Chuzhou Longpan wastewater treatment plant tailwater treatment project

100,000 m3/d of tailwater with the water quality of class 1A of national WWTP discharge standard from the Longpan wastewater treatment plant discharged into the Longyu river. MABR modules were installed into the tailwater stream outside of the discharge outlet to implement the tailwater treatment. After the installation and commissioning were complete, the effluent quality reaches level IV of the national surface water standard.

classification:

老案例


Describe

100,000 m3/d of tailwater with the water quality of class 1A of national WWTP discharge standard from the Longpan wastewater treatment plant discharged into the Longyu river. MABR modules were installed into the tailwater stream outside of the discharge outlet to implement the tailwater treatment. After the installation and commissioning were complete, the effluent quality reaches level IV of the national surface water standard.